Wheatstone offshore compressed

Wheatstone LNG is a world-class asset, adding volumes to Woodside's annual production since 2017.

Operated by Chevron on behalf of the Wheatstone Joint Venture, Wheatstone LNG processes gas from the offshore Wheatstone, Iago, Julimar and Brunello gas fields, 220 km from Onslow, Western Australia. Once fully operational, Wheatstone LNG will contribute over 13 MMboe of Woodside's annual LNG and domestic gas production.

LNG Train 2 successfully commenced production in June 2018 and domestic gas production is expected to commence in 2019.

All images provided courtesy of Chevron Australia.

Key stats

8.9 mtpa
capacity. 1.16 mtpa Woodside share.
200 TJ/day
domestic gas plant expected to commence production in 2019

Participating interests

Wheatstone LNG processes gas from two separate upstream developments, the Wheatstone Project (80%) and the Julimar Development Project (20%).

ParticipantWheatstone ProjectJulimar Development Project

Woodside (operator, Julimar Development Project)

13%165%

Chevron (operator, Wheatstone LNG, Wheatstone Project)

64.1% 
Kuwait Foreign Petroleum Exploration Company (KUFPEC) 13.4%35%
Kyushu Electric Power Company1.5% 
PE Wheatstone8% 

 

¹ Woodside’s 13% non-operated interest in the Wheatstone Project includes the offshore platform, the pipeline to shore and the onshore plant, but excludes the Wheatstone and Iago fields and subsea infrastructure.

Gas
Oil
Gas or Oil
Exploring
Developing
Producing
Existing Trunkline
Proposed Trunkline
Title