Adaptive Management Program

The Draft Adaptive Management Program (AMP) was approved by the Western Australian Department of Environment and Conservation (DEC) prior to the commencement of Phase One Maxima 3D MSS.

The Draft AMP set out the way Woodside will:

  • Monitor and report on the sound exposure levels, faunal mortality, possible coral damage and specific acoustic impacts to fish as  a result of air gun emissions from Phase one of the survey; and
  • Allow the development of defined and measurable trigger values and a framework of associated operational responses for the  final AMP for Phase two of the survey.

Woodside submitted the Final AMP to the DEC after Phase One of the Maxima 3D MSS was completed. Phase Two of the Maxima 3D MSS was then able to commence two days after the submission of the Final AMP.

The Final AMP is available for download below.

Final Adaptive Management Program 

Cover Page
Table of Contents
Chapter 1 - Introduction
Chapter 2 - Phase One Survey
Chapter 3 - Verification of Minimal Airgun Array Configuration of Phase Two Survey
Chapter 4 - Final Adaptive Management Program Trigger Values Operational Reponses and Responsible Personnel
Chapter 5 - Marine Faunal Observations During the Phase Two Survey
References
Appendix A - Monitoring Results Summary Proformas
Appendix B - Verification of Minimum Airgun Array Configuration
Appendix C - Mapping of Habitat Impact Exposure to Selected Sound Exposure Levels